At 0730 I was eating breakfast here with some fine gentlemen.
All grandpa’s should be this cool!
These pork loins marinated overnight and went into the Bradley Smoker when I returned.
Then it was time to work on installing the two extra 6 volt batteries and moving the chassis batteries.
These two batteries along with wiring are…
going to be moved to here…… after a shelf is made and installed.
I removed the chassis batteries and installed the 2 new 6 volt batteries on the left where the chassis batteries were. The wiring will come later.
The batteries fit real nice, all 6 six volts. Not wired yet. That area to the far left is where the chassis batteries (two 12 volts) will go.
I had to call in the Seabee, Ed Kruty..
Then we got both batteries in the compartment with not too much room to play. They are on a steel platform that Ed built and then installed. He then said the wiring was up to me…I can do that!
That is with the help from Denny and a trip to get some cables made.
We wired up the house batteries then the chassis batteries. Tomorrow I will make the wiring neat and safe. No sparks or shocks and everything works.
Now it’s time to look at the smoker….wow…
While others went to the local restaurant we had diner with a few close old friends and all enjoyed the pork…it was juicy.
We watched some TV and the day was over. Damn I missed by power nap time.
See ya….